Training Equipment in Industrial Pneumatics Description and Specifications for Lab Tenders
Training Equipment in Industrial Pneumatics.
The set up comprises a Mobile Lab. Trolley, set of Pneumatic Components and a Comprehensive Manual. Mobile lab. trolley [1] Approx. dim: 1210mm(L) x 750mm(W) x 1450mm(H). [2] The trolley must have two (2) circuit building plugboards (approx. size) 1100mm x 700mm, each with mounting holes must be fitted with rubber component retaining grommets. [3] The boards must be powder coated 16swg steel (at least), with 2mm shrouded sockets for electrical distribution built into the plugboard. [4] There must be two (2) lockable equipment storage cabinets, each consists of five (5) drawers (depths are 1 x 66mm, 2 x 85mm, 1 x 130mm, 1 x 200mm ‐ approx. sizes). Cabinets and all drawers to be steel, powder coated construction including drawer fronts. [5] The trolley must be mounted on four (4) heavy duty, rubber tyred castors two (2) of which are swivel and lockable. [6] The trolley must be mounted on four (4) heavy duty castors two(2) of which are swivel and lockable. Set of Components ‐ Pneumatics, comprises:‐ [7] 1 x Air service unit (filter/pressure regulator) with ON/OFF valve and pressure gauge [8] 1 x 6‐way manifold with check fittings (airflow blocked on removal of tubing) [9] 1 x Single Acting Cylinder ‐ 16mm diameter, 50mm stroke [10] 2 x Double Acting Cylinder ‐ 16mm diameter, 100mm stroke
with magnetic piston for contactless sensing [11] 4 x 3/2 way Push Button Valve (2 baseplates each with 2 valves) [12] 1 x 3/2 way Toggle Lever Valve [13] 1 x Visual Indicator [14] 1 x 5/2 way Toggle Lever Valve [15] 1 x 5/2 way Pilot/spring Valve [16] 3 x 5/2 way Pilot/Pilot Valve [17] 1 x 5/3 way Pilot/Pilot Valve with Closed centre [18] 2 x 3/2 way Roller Lever Valve (for instroke operation) ‐ mounted on adjustable baseplate (must have both vertical and horizontal adjustment). [19] 2 x 3/2 way Roller Lever Valve (for outstroke operation) ‐ mounted on adjustable baseplate (must have both vertical and horizontal adjustment). [20] 1 x 3/2 way Adjustable Timer valve [21] 2 x Throttle / Check Valve (on one baseplate) [22] 1 x Quick Exhaust Valve [23] 4 x Shuttle Valve / OR Gate (2 baseplates each with 2 valves) [24] 2 x Two Pressure Valve / AND Gate (on one baseplate) [25] 1 x Stainless Steel Air Reservoir [26] 1 x Pressure Gauge [27] 10 x Push‐fit Tee [28] 10 x Push‐fit Plug [29] 15 metres 4mm o.d. polyurethane tubing [30] 5 metres 6mm o.d. polyurethane tubing [31] All pneumatic components should mount on four (4) pin plug‐in baseplate, complete ready to use with pneumatic connections for 4mm o.d. tubing (supplied) and 2mm shrouded plugs / sockets for electrical connections. All threaded exhaust ports to be fitted with silencers. Manual: [32] A comprhesive set of Exercises / Solutions